Search
- Working Paper
How CBO Uses the ReEDS Model to Analyze Policies in the Electric Power Sector: Working Paper 2024-02
This working paper provides an overview of CBO-ReEDS, an adapted version of the National Renewable Energy Laboratory’s Regional Energy Deployment System (NREL’s ReEDS) model for analyzing policies in the electric power sector.
- Cost Estimate
As reported by the House Committee on Natural Resources on April 15, 2024
- Cost Estimate
As reported by the Senate Committee on Energy and Natural Resources on April 8, 2024
- Cost Estimate
As reported by the House Committee on Science, Space, and Technology on September 22, 2023
- Report
Between 1980 and 2022, the shipbuilding composite index grew an average of 1.2 percentage points faster per year than the GDP deflator did. Looking ahead, a gap of roughly 1 percentage point would be consistent with historical experience.
- Report
CBO estimates that construction of 18 medium landing ships would cost between $6.2 billion and $7.8 billion in 2024 dollars. CBO’s estimates range from two to roughly three times the Navy’s current estimates.
- Cost Estimate
As reported by the Senate Committee on Energy and Natural Resources on December 12, 2023
- Cost Estimate
As ordered reported by the House Committee on Natural Resources on January 17, 2024
- Cost Estimate
As ordered reported by the House Committee on Energy and Commerce on December 5, 2023
- Cost Estimate
As ordered reported by the House Committee on Natural Resources on October 26, 2023